Installation Of Barriers
Sep 07, 2022
Fourth, the installation of the gate 1. The pre-embedded line is determined according to the customer's requirements, and the concrete base needs to be poured in advance (the size of the base is about 100-150mm larger than the size of the bottom of the gate). Pre-buried or excavated cable trenches between the control room or sentry box, the 3X1.5 square millimeter power line and 4X0.5 square millimeter control line used for burying the line pipe into the equipment are confirmed to be correct and backfilled with concrete 2. Fix the case and place it in a fixed position , Open the case door and loosen the fixed cap wing nut (the case door and cap are carefully placed to avoid scratches on the surface) Mark the screw hole of the chassis bottom plate and the edge of the chassis base, remove the gate and make a mark. Use a drill to drill vertically on the screw hole. (The size of the drill bit should match the expansion bolts provided with the equipment.) The depth should meet the requirements of the length of the expansion bolts. Move the chassis to the original position and drive the expansion bolts and tighten them firmly. 3. Brake lever installation The gate case is fixed firmly, and the position of the brake lever installation lever is tightened with the equipped screws and the inclination of the brake lever needs to be installed fork lever to adjust the vertical and horizontal state. 4. Peripheral equipment installation The gate is installed firmly and the debugging is completed. According to the customer's needs, connect the chassis circuit and related peripheral equipment control circuit according to the wiring diagram of the gate control board and conduct related debugging. The above is the main process of gate installation, but there are still many places to pay attention to during the installation of the gate. The following are the precautions during the installation of the gate.







